Chula Vista, CA – New Hope Community Church Solar Panel Project

Palomar Solar LG

Project Description

Client: New Hope Community Church

Location:  Chula Vista, CA
System Size: 70.2 kW DC
Completion Date: 08/24/2016

Product:
234 LG solar panels with Solar Edge inverters and DC power optimizers.  This system has per solar panel monitoring as well to hold all parties accountable for the 25 year warranties. Most companies do not offer per solar panel monitoring especially on commercial projects

Summary:
We were first introduced to New Hope Community Church from a residential consultation we did of for one of the members. Just like all of our projects their team interviewed several contractors before selecting Palomar Solar. One of the things that stood out to us about New Hope Community Church, was that they even took the time as a group to meet us on site of a couple projects that we had completed on a similar roof type as theirs.

We really appreciate New Hope Community Church for the opportunity to help them go solar! Thank you for letting us get creative with the design as well! This is believed to be the first solar cross in the country.

Zip: 92025

Poway, CA / Living Way Church

solar-panels-roof-mount-13609-twin-peaks-road-poway-ca-92064-1

Project Description

Client: Living Way Church

Location: Poway, CA
System Size: 5.40 kW DC
Completion Date:  08/04/2015

Product:
18 LG solar panels, 18 Enphase microinverters

Zip: 92064

San Diego, CA / Temple Emanu-EL

solar-temple-emanu-el-6299-capri-dr-san-diego-ca-92120-1

Project Description

Client: Temple Emanu-EL
A Home, A family, A Warmth to Tradition

Location: San Diego, CA
System Size: 67.50 kW DC
Completion date: 04/062016

Product:
225 LG Solar panels, 225 Enphase microinverters. This system has per solar panel monitoring as well to hold all parties accountable for the 25 year warranties.
Time:
The job was completed within 6 months of signing the contract. Actual time on site was 8 days.

Summary:
Palomar Solar was referred by one of the members of the Temple.

After extensive research we are thankful they choose us to complete their project.

We were able to coordinate the install when the school was on a break to minimize any further risks associated with the installation.

Zip: 92120

Palomar Solar Project Installations

palomar-solar-installations

Always Adding New Projects

We are constantly adding new projects to our project gallery every day.  In the meantime, please explore our installation map and view projects that we have completed in your neighborhood, our commercial projects and non-profit/church projects.

View Palomar Solar's Installation Projects

Escondido, CA / Church of St. Timothy

church-st-timothy-2960-canyon-rd-escondido-ca-92025-5

Project Description

Client:   Church of St. Timothy

Location: Escondido, CA
System Size: 80.00 kW DC
Completion Date: 7/07/2016

Product:
250 LG solar panels, 250 Enphase microinverters.  This system has per solar panel monitoring as well to hold all parties accountable for the 25 year warranties.

Time:
The job was completed within 6 months of signing the contract.  Actual time on site was 14 days.

Summary:
This project was first brought to our attention back in 2014.  After years of research by the Finance Council, consultation with the diocese, comparisons and bidding with multiple solar contractors are happy to deliver this exciting project.

We appreciate all the due diligence their committee performed and thankful for the opportunity.

Zip: 92025

Temecula, CA / Calvary Baptist

solar-panels-ground-mount-nicolas-rd-temecula-ca-92591

Project Description

Client:   Calvary Baptist Church

Location: Temecula, CA
System Size: 39.75 kW DC
Completion Date: 05/06/2015

Product:
150 LG solar panels, 150 Enphase microinverters
This system has per solar panel monitoring as well to hold all parties accountable for the 25 year warranties

Project Description:
We were introduced to Pastor Rench by a member of the congregation, for whom we had installed a 60-panel ground mount several years prior. After extensive research, including screening several solar contractors, we were humbled and grateful to have been selected to help Calvary Baptist go solar. The challenge for this project was they did not want the system on the roof. Instead, they wanted it installed on the hill behind the church that was over 300-feet away from the main electrical panel.

The system was installed within 7 days and given permission to operate a month ahead of schedule.